Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Ansteel Baostell, Wusteel |
Model Number : | Q195, Q235 SGCC, SGCH,SGC340 SGC400 SGC440 SGC490 SGC570 DX51D DX52D DX53D DX54D S220GD S250GD S280GD S320GD S350GD S400GD S500GD S550GD |
Certification : | ISO9001/CE/SGS |
Price : | Negotiation |
Payment Terms : | 30%T/T for deposit, 70% balance before shipment or L/C at sight |
Supply Ability : | 1000 Tons per month |
Delivery Time : | 5-8weeks |
Hot Dip Galvanized Steel Tube Pre Galvanized Pipe Furniture Steel Tube Gi Pipe Steel Pipe
Commodity | Pre Galvanized Round Steel Pipe |
Outer Diameter | 1/2”~8” 20~219mm |
Thickness | 0.8~2.75mm |
Length | Normal 5.8m, 6m ,random length can be customized |
Zinc Coating | 40~275g/㎡ |
Tolerance | OD:+/-0.5mm |
WT: +/-0.05mm | |
Length: +/-20mm | |
Straightness | As Per Standard |
Material | Q195,Q215,Q235,Q355, Gr.A, Gr.B, S235-JRH,STK400,STK500 |
Standard | GB/T6728-2016 ,EN10219, ASTM A500, EN10305, AS1163 |
Certificate | ISO 9001,IS014001,ISO45001,ISO50001,CE,LR,ICC,SGS.BV etc |
Surface Treatment | Zinc plated ,Passivation, Marking,Embossing |
Pipe End | Plain end / Blunt end / Screwed and socked & protected by plastic
caps |
Deep Processing | Threaded,sockets,end cap,painting,powder coated, oiled,
punching,shrink,woven bag, stamping,embossing ect. |
Packing | In Bundles, Water Proof Plastic Packing ,in Bulk etc |
In hexagonal seaworthy bundles packed by steel strips. | |
small sizes nested into big sizes. | |
Applications | Steel Structure,Scaffolding,Fence,Conduit,Greenhouse,Decorative
pipe, Post, Roofing |
Techinical | ERW (high - frequency welded) |
Shipping Port | Xin’gang, China |
TVade Term | FOB, CFR, CIF, EXW, FCA |
MOQ | Marketing (normal) Size: 0 MOQ OEM Size: 10 tons for each size |
Shipment | 20 feet container , the max length 5.85m without coupling, 5.8m
with coupling |
40 feet container , the max length 12.0m or 6.0m in two rows. | |
Bulk carrier no limits on pipe length. | |
Payment Term | T/T, LC, Or as discussion |
Delivery Time | 10-30 days (based on size & quantity) after receiving down payment
by T/T or LC .If customers inquiry pipes in stock, delivery time in
5days |
![]() |